GSD WA Case Study

Growth in Western Australia’s resources industry creates opportunity, but it also places increasing demands on the businesses that support it. Contractors are expected to mobilise quickly, operate safely and deliver consistent results, often in remote locations where…

Lismore City Council Case Study

Lismore City Council, located in the Northern Rivers region of New South Wales, manages a diverse operational footprint spanning approximately 1,300 km². The region includes urban environments, rural farmland, rainforests, and national parks, all of which present…

Yarra Trams Case Study

Background Yarra Trams operate Melbourne’s extensive tram network – the largest urban tram system in the world – covering 250 kilometres of double track across 24 routes, with a fleet of almost 500 trams. To keep more than 5,000 services a day running safely and…

InterGroup Case Study

Background The Ohaaki Geothermal Power Station in New Zealand operates cooling towers that accumulate substantial sludge deposits at their base over time. Historically, de-sludging has been attempted only every four to eight years. Until recently, this meant sending…

Pezzimenti Trenchless Case Study

As urban expansion continues, the need for efficient and minimally invasive sewer infrastructure projects has never been greater. Traditional excavation methods often lead to significant surface disruption, prolonged project timelines, and increased costs. For complex…

Goldfields Protective Coatings Case Study

When a blocked decant pipe brought production to a crawl at a Western Australian mine, Goldfields Protective Coatings (GPC) were called in to assess and resolve the issue. Located in Norseman, a region known for its tough working conditions, the process water pond at…